Smart Logistics & Robotics

JIT Precision Material Supply Solution for Production Lines

Reduce downtime loss by 90%, increase changeover efficiency by 70%, and enable JIT precision material supply.

Core Industry Pain Points

  • Production line cycle mismatch: Unstable manual delivery speeds fail to meet JIT material supply requirements, leading to frequent mis-picks and stockouts.
  • Extremely low switching efficiency: Disorganized material loading/unloading during line changeovers, prolonged manual handling, and high risk of confusion for multi-SKU, small-batch materials.
  • High labor management costs: Delivery involves high-intensity, repetitive work, making recruitment difficult and turnover rates high.
  • No digital traceability for processes: Delivery tasks lack complete records, and material flow nodes cannot be monitored.

Solution Overview

Addressing delivery challenges in 3C electronics and precision manufacturing, we offer a JIT material supply solution powered by AMR robots. With a slim chassis (as narrow as 70 cm), custom anti-static trays, and two operating modes—line-triggered dispatch and scheduled cyclic delivery—we synchronize with your production rhythm. The system supports automatic elevator use for inter-floor transport, ensures complete traceability of sample movement, and eliminates mix-ups.

Core Features

  • Compact body design: fits narrow production lines with a minimum clearance of 70 cm.
  • Custom Anti-Static Trays: Designed for Dust-Free Transport of Precision Components
  • Dual-mode delivery: Line-call and scheduled cyclic delivery to match line takt time.
  • Auto elevator cross-floor transfer: Full sample tracking prevents material mix-ups.
  • Multi-machine synchronized feeding: Supply multiple production lines simultaneously to minimize downtime and waiting.
  • Remotely adjust delivery routes: switch production lines without relaying tracks in 10 minutes.

Tangible Results

  • Reduced production line downtime loss by 90%, on-time material delivery rate 100%
  • Reduce changeover time for new product materials by 70%, enabling rapid adaptation to flexible, multi-variety, low-volume production.
  • Replaces over 80% of manual delivery roles, saving 60-80 K in annual labor costs
  • Zero incidents of incorrect or missing shipments; product defect rates dropped significantly due to reduced manual handling damage.

Industry Solutions

3C ElectronicsPrecision ManufacturingMedical DeviceAutomotive Parts